Underground boreholes and water wells

To provide for the supply of high-quality underground water into the buildings, we realize drilled wells and bores. These collection objects are as much as 120 m deep. Before the work starts, the spring must be laid out, or else a test hole must be drilled.

Technological development and connection of the bore

After building the collection source, the technological development is carried out, using the pumping set, with connection to the internal water pipes in the building. Based on ones own hydrotechnological calculations, the facility is dimensioned, taking into account the need for water and pressure. Subsequently, a gate pit is installed onto the head of the bore, a submersible pump, and a set for measuring pressure. Included in the delivery, there is a complete technological distribution of heavy current, including controls. Among the most frequently installed types of submersible pumps, we can name GRUNGFOS, LOWARA, or SIGMA. 

Underground bores and wells