ASP drainage facility
400–2000 EO
Small built-up area: Vertical running mode makes use of the advantage of height mounting of the pressing unit enabling easier handling of output media. No extensive constructional modifications are required.
Variability of construction: Enables possible assembly and repeated use only at the time of pressing. The press construction is undercarriaged and it may be placed next to constructional objects.
Unmanned operation mode: After being commissioned to operation, permanent presence of operator is not required.
Supporting materials for the project documentation: including consultancy.
Low operating costs
Cyclic operation mode: filling - pressing - emptying - cleaning