ASP drainage facility

400–2000 EO

Small built-up area: Vertical running mode makes use of the advantage of height mounting of the pressing unit enabling easier handling of output media. No extensive constructional modifications are required. 

Variability of construction: Enables possible assembly and repeated use only at the time of pressing. The press construction is undercarriaged and it may be placed next to constructional objects.

Unmanned operation mode: After being commissioned to operation, permanent presence of operator is not required. 

Supporting materials for the project documentation: including consultancy.

Low operating costs

Cyclic operation mode: filling - pressing - emptying - cleaning